On July 12, 2021 at 17:55, Everwinreceived a call from Mr. Chen
Haosong from the Energy Management Department of COSCO Shipping
Bulk Co., Ltd. regarding the grounding of the HUA SHENG HAI
vessel after it set sail, resulting in water leakage in the
engine room. Immediately after receiving the instructions from
the shipowner, Everwin activated the emergency plan and
coordinated relevant protection and cleanup operations.
At
18:05, Everwin's General Manager, Mr. Shi Shengwen, communicated
with the HUA SHENG HAI vessel over the phone to learn about the
specific location of the vessel damage, which was determined to
be at the bottom of the ship. At 18:12, Everwin contacted Mr.
Wang Xinquan, an official from the Second Supervision Division
of the Dalian Maritime Safety Administration, over the phone to
seek guidance on the relevant requirements and instructions for
pollution cleanup and protection operations for the vessel. With
the reverent documents and report was ready, Everwin dispatched
the vessels and team immediately to the scene. Once arrived,
Everwin immediately began the pollution prevention
operations.
On July 13th, 2021 at 09:10, Li Wenyuan,
the Deputy General Manager at COSCO Shipping Bulk Co. Ltd.,
contacted Everwin requesting to send diving pumps, cables, and
other equipment to the HUA SHENG HAI vessel for emergency use.
Everwin coordinated with the Dalian Maritime Safety
Administration successfully and set out with the requested
equipment towards the vessel.